TIMESCALE OF THE
SHOOTING SCHEDULE
9:15: EVERYONE MEET
IN FILMING ROOM
9:20: COLLECT
CAMERAS AND TRIPODS
9:25: EVERYONE IN
STUDIO- MEET CAST (FRAN)
9:30: PREPARED
STUDIO (INFLATABLE LIGHTS)
9:35: RUN THROUGH
SONG LIP SYNC
9:50: TALK TO FRAN
ABOUT FIRST DIRECTIONS FOR FIRST VERSE
10:00: FIRST TAKE
(UP TO BRIDGE)
10:20: SECOND
TAKE
10:40:
BREAK
10:50: BACK TO
STUDIO/ TALK TO FRAN ABOUT CHORUS
11:00: SHOOT CHORUS
(LIP SYNCING)
11:20: SECOND TAKE
(IF MISTAKES)
11:40: TALK TO FRAN
ABOUT SECOND VERSE AND CHORUS
11:55: SHOOT SECOND
PART OF THE SONG
12:45:
LUNCH
1:30: MEET BACK IN
STUDIO
1:40: RETAKE ANY
MISTAKES FOR THE SECOND PART OF THE SONG
2:30:
BREAK
3:00: MEET IN STUDIO
AND PACK UP
3:20: MOVE UP TO
HURTWOOD AND SET UP LIGHTS AND SET
4:00: MEET OTHER
CAST MEMBERS AND TALK THEM THROUGH WHAT WE WANT
4:20: SHOOT FIRST
VERSE AND CHORUS
4:35: RESHOOT IF
MISTAKES
4:50: SHOOT SECOND
PART
5:10: SEND CAST HOME
AND SHOOT IN THE WOODS WITH LAYLA AND LEAH
6:00: FINISH SHOOT
No comments:
Post a Comment